2025 Q4 -tulosraportti
37 päivää sitten
‧36 min
Tarjoustasot
Oslo Børs
Määrä
Osto
-
Myynti
Määrä
-
Viimeisimmät kaupat
| Aika | Hinta | Määrä | Ostaja | Myyjä |
|---|---|---|---|---|
| 999 | - | - | ||
| 1 | - | - | ||
| 90 | - | - | ||
| 100 | - | - | ||
| 126 | - | - |
Välittäjätilasto
Dataa ei löytynyt
Yhtiötapahtumat
Datan lähde: FactSet, Quartr| Seuraava tapahtuma | |
|---|---|
2026 Q1 -tulosraportti 12.5. |
| Menneet tapahtumat | ||
|---|---|---|
2025 Q4 -tulosraportti 4.2. | ||
2025 Q3 -tulosraportti 31.10.2025 | ||
2025 Q2 -tulosraportti 19.8.2025 | ||
2025 Q1 -tulosraportti 21.5.2025 | ||
2024 Q4 -tulosraportti 11.2.2025 |
Asiakkaat katsoivat myös
Shareville
Liity keskusteluun SharevillessäShareville on aktiivisten yksityissijoittajien yhteisö, jossa voit seurata muiden asiakkaiden kaupankäyntiä ja omistuksia.
Kirjaudu
- ·3 t sittenTranslated report: Oslo, Norway - March 13, 2026. Nordic Mining ASA ("Nordic Mining" or "the Company") today provides an operational and ramp-up update from Engebø Rutile and Garnet ("ERG"), including progress made since the launch of the improvement plan in January and the main priorities for achieving stable production. The update, available in video format, features CEO Finn Ivar Marum and ERG's CEO Andrew Templeman, and is available on the company's website: https://nordicmining.com/operational-upda.ramp-up -progress/ (https://nordicmining.com/operational-update-from-engebo-ramp-up -progress/) Nordic Mining continues to advance through the ramp-up phase. Since January, several technical and operational initiatives have been implemented, with early effects now becoming visible, especially in the wet plant. In February, an independent third-party validation confirmed that the processing plant can operate at full design capacity. · Over the past weeks and months, our work has focused on executing the ramp-up in a systematic and controlled manner. We still have challenges to solve, but the direction is clear, and improvements are progressing step by step. Our priority now is to stabilize performance to enable optimization for ramp-up and stable production at design capacity by year-end, says Finn Ivar Marum, CEO of Nordic Mining. Highlights · Structured ramp-up plan progressing, with clear priorities for both wet and dry plants · Steady-state production at design capacity by year-end remains the goal · Technical adjustments ongoing across circuits, combined with strengthened operational routines and training · Team of technical and operational experts on site to support the execution of the ramp-up plan · Process and logistics setup continues to support efficient operation as stabilization improves All in all, the plan initiated in January is starting to yield results, with the most significant operational gains expected through the second quarter as remaining bottlenecks are addressed. Key operational focus areas · Wet plant improvements: Adjustments to water management and process control have improved water quality, resulting in fewer downtimes and higher throughput. Further effects are expected during the second quarter · Rutile circuit: Optimization depends on stable performance in the dry plant. This remains a key focus area, supported by external rutile processing expertise now being brought in · WHIMS circuits: Magnetic separators are being fine-tuned and adjusted for increased capacity and more stable production The Company will publish a production update on April 13 and present its first-quarter results on May 12.
- ·6 t sittenIt will be fun to see how fast the price goes down again. Full design capacity will be reached around 2027. This was a short-lived piece of news with little new information. Looking forward to the court decision :)5 t sitten5 t sittenWHIMS circuits Magnetic separators are being tuned and adjusted to increase capacity and ensure more stable output. Nordic Mining will publish its next production update on 13 April, followed by the Q1 results presentation on 12 May.
Yllä olevat kommentit ovat peräisin Nordnetin sosiaalisen verkoston Sharevillen käyttäjiltä, eikä niitä ole muokattu eikä Nordnet ole tarkastanut niitä etukäteen. Ne eivät tarkoita, että Nordnet tarjoaisi sijoitusneuvoja tai sijoitussuosituksia. Nordnet ei ota vastuuta kommenteista.
Uutiset
Tämän sivun uutiset ja/tai sijoitussuositukset tai otteet niistä sekä niihin liittyvät linkit ovat mainitun tahon tuottamia ja toimittamia. Nordnet ei ole osallistunut materiaalin laatimiseen, eikä ole tarkistanut sen sisältöä tai tehnyt sisältöön muutoksia. Lue lisää sijoitussuosituksista.
2025 Q4 -tulosraportti
37 päivää sitten
‧36 min
Uutiset
Tämän sivun uutiset ja/tai sijoitussuositukset tai otteet niistä sekä niihin liittyvät linkit ovat mainitun tahon tuottamia ja toimittamia. Nordnet ei ole osallistunut materiaalin laatimiseen, eikä ole tarkistanut sen sisältöä tai tehnyt sisältöön muutoksia. Lue lisää sijoitussuosituksista.
Shareville
Liity keskusteluun SharevillessäShareville on aktiivisten yksityissijoittajien yhteisö, jossa voit seurata muiden asiakkaiden kaupankäyntiä ja omistuksia.
Kirjaudu
- ·3 t sittenTranslated report: Oslo, Norway - March 13, 2026. Nordic Mining ASA ("Nordic Mining" or "the Company") today provides an operational and ramp-up update from Engebø Rutile and Garnet ("ERG"), including progress made since the launch of the improvement plan in January and the main priorities for achieving stable production. The update, available in video format, features CEO Finn Ivar Marum and ERG's CEO Andrew Templeman, and is available on the company's website: https://nordicmining.com/operational-upda.ramp-up -progress/ (https://nordicmining.com/operational-update-from-engebo-ramp-up -progress/) Nordic Mining continues to advance through the ramp-up phase. Since January, several technical and operational initiatives have been implemented, with early effects now becoming visible, especially in the wet plant. In February, an independent third-party validation confirmed that the processing plant can operate at full design capacity. · Over the past weeks and months, our work has focused on executing the ramp-up in a systematic and controlled manner. We still have challenges to solve, but the direction is clear, and improvements are progressing step by step. Our priority now is to stabilize performance to enable optimization for ramp-up and stable production at design capacity by year-end, says Finn Ivar Marum, CEO of Nordic Mining. Highlights · Structured ramp-up plan progressing, with clear priorities for both wet and dry plants · Steady-state production at design capacity by year-end remains the goal · Technical adjustments ongoing across circuits, combined with strengthened operational routines and training · Team of technical and operational experts on site to support the execution of the ramp-up plan · Process and logistics setup continues to support efficient operation as stabilization improves All in all, the plan initiated in January is starting to yield results, with the most significant operational gains expected through the second quarter as remaining bottlenecks are addressed. Key operational focus areas · Wet plant improvements: Adjustments to water management and process control have improved water quality, resulting in fewer downtimes and higher throughput. Further effects are expected during the second quarter · Rutile circuit: Optimization depends on stable performance in the dry plant. This remains a key focus area, supported by external rutile processing expertise now being brought in · WHIMS circuits: Magnetic separators are being fine-tuned and adjusted for increased capacity and more stable production The Company will publish a production update on April 13 and present its first-quarter results on May 12.
- ·6 t sittenIt will be fun to see how fast the price goes down again. Full design capacity will be reached around 2027. This was a short-lived piece of news with little new information. Looking forward to the court decision :)5 t sitten5 t sittenWHIMS circuits Magnetic separators are being tuned and adjusted to increase capacity and ensure more stable output. Nordic Mining will publish its next production update on 13 April, followed by the Q1 results presentation on 12 May.
Yllä olevat kommentit ovat peräisin Nordnetin sosiaalisen verkoston Sharevillen käyttäjiltä, eikä niitä ole muokattu eikä Nordnet ole tarkastanut niitä etukäteen. Ne eivät tarkoita, että Nordnet tarjoaisi sijoitusneuvoja tai sijoitussuosituksia. Nordnet ei ota vastuuta kommenteista.
Tarjoustasot
Oslo Børs
Määrä
Osto
-
Myynti
Määrä
-
Viimeisimmät kaupat
| Aika | Hinta | Määrä | Ostaja | Myyjä |
|---|---|---|---|---|
| 999 | - | - | ||
| 1 | - | - | ||
| 90 | - | - | ||
| 100 | - | - | ||
| 126 | - | - |
Välittäjätilasto
Dataa ei löytynyt
Asiakkaat katsoivat myös
Yhtiötapahtumat
Datan lähde: FactSet, Quartr| Seuraava tapahtuma | |
|---|---|
2026 Q1 -tulosraportti 12.5. |
| Menneet tapahtumat | ||
|---|---|---|
2025 Q4 -tulosraportti 4.2. | ||
2025 Q3 -tulosraportti 31.10.2025 | ||
2025 Q2 -tulosraportti 19.8.2025 | ||
2025 Q1 -tulosraportti 21.5.2025 | ||
2024 Q4 -tulosraportti 11.2.2025 |
2025 Q4 -tulosraportti
37 päivää sitten
‧36 min
Uutiset
Tämän sivun uutiset ja/tai sijoitussuositukset tai otteet niistä sekä niihin liittyvät linkit ovat mainitun tahon tuottamia ja toimittamia. Nordnet ei ole osallistunut materiaalin laatimiseen, eikä ole tarkistanut sen sisältöä tai tehnyt sisältöön muutoksia. Lue lisää sijoitussuosituksista.
Yhtiötapahtumat
Datan lähde: FactSet, Quartr| Seuraava tapahtuma | |
|---|---|
2026 Q1 -tulosraportti 12.5. |
| Menneet tapahtumat | ||
|---|---|---|
2025 Q4 -tulosraportti 4.2. | ||
2025 Q3 -tulosraportti 31.10.2025 | ||
2025 Q2 -tulosraportti 19.8.2025 | ||
2025 Q1 -tulosraportti 21.5.2025 | ||
2024 Q4 -tulosraportti 11.2.2025 |
Shareville
Liity keskusteluun SharevillessäShareville on aktiivisten yksityissijoittajien yhteisö, jossa voit seurata muiden asiakkaiden kaupankäyntiä ja omistuksia.
Kirjaudu
- ·3 t sittenTranslated report: Oslo, Norway - March 13, 2026. Nordic Mining ASA ("Nordic Mining" or "the Company") today provides an operational and ramp-up update from Engebø Rutile and Garnet ("ERG"), including progress made since the launch of the improvement plan in January and the main priorities for achieving stable production. The update, available in video format, features CEO Finn Ivar Marum and ERG's CEO Andrew Templeman, and is available on the company's website: https://nordicmining.com/operational-upda.ramp-up -progress/ (https://nordicmining.com/operational-update-from-engebo-ramp-up -progress/) Nordic Mining continues to advance through the ramp-up phase. Since January, several technical and operational initiatives have been implemented, with early effects now becoming visible, especially in the wet plant. In February, an independent third-party validation confirmed that the processing plant can operate at full design capacity. · Over the past weeks and months, our work has focused on executing the ramp-up in a systematic and controlled manner. We still have challenges to solve, but the direction is clear, and improvements are progressing step by step. Our priority now is to stabilize performance to enable optimization for ramp-up and stable production at design capacity by year-end, says Finn Ivar Marum, CEO of Nordic Mining. Highlights · Structured ramp-up plan progressing, with clear priorities for both wet and dry plants · Steady-state production at design capacity by year-end remains the goal · Technical adjustments ongoing across circuits, combined with strengthened operational routines and training · Team of technical and operational experts on site to support the execution of the ramp-up plan · Process and logistics setup continues to support efficient operation as stabilization improves All in all, the plan initiated in January is starting to yield results, with the most significant operational gains expected through the second quarter as remaining bottlenecks are addressed. Key operational focus areas · Wet plant improvements: Adjustments to water management and process control have improved water quality, resulting in fewer downtimes and higher throughput. Further effects are expected during the second quarter · Rutile circuit: Optimization depends on stable performance in the dry plant. This remains a key focus area, supported by external rutile processing expertise now being brought in · WHIMS circuits: Magnetic separators are being fine-tuned and adjusted for increased capacity and more stable production The Company will publish a production update on April 13 and present its first-quarter results on May 12.
- ·6 t sittenIt will be fun to see how fast the price goes down again. Full design capacity will be reached around 2027. This was a short-lived piece of news with little new information. Looking forward to the court decision :)5 t sitten5 t sittenWHIMS circuits Magnetic separators are being tuned and adjusted to increase capacity and ensure more stable output. Nordic Mining will publish its next production update on 13 April, followed by the Q1 results presentation on 12 May.
Yllä olevat kommentit ovat peräisin Nordnetin sosiaalisen verkoston Sharevillen käyttäjiltä, eikä niitä ole muokattu eikä Nordnet ole tarkastanut niitä etukäteen. Ne eivät tarkoita, että Nordnet tarjoaisi sijoitusneuvoja tai sijoitussuosituksia. Nordnet ei ota vastuuta kommenteista.
Tarjoustasot
Oslo Børs
Määrä
Osto
-
Myynti
Määrä
-
Viimeisimmät kaupat
| Aika | Hinta | Määrä | Ostaja | Myyjä |
|---|---|---|---|---|
| 999 | - | - | ||
| 1 | - | - | ||
| 90 | - | - | ||
| 100 | - | - | ||
| 126 | - | - |
Välittäjätilasto
Dataa ei löytynyt




