Q2-osavuosiraportti
83 päivää sitten‧53 min
Tarjoustasot
Oslo Børs
Määrä
Osto
3 767
Myynti
Määrä
9 260
Viimeisimmät kaupat
| Aika | Hinta | Määrä | Ostaja | Myyjä |
|---|---|---|---|---|
| - | - | - | - |
Ylin
-VWAP
Alin
-Vaihto ()
VWAP
Ylin
-Alin
-Vaihto ()
Välittäjätilasto
Dataa ei löytynyt
Yhtiötapahtumat
| Seuraava tapahtuma | |
|---|---|
| 2025 Q3-osavuosiraportti | 20.11. 3 päivää |
| Menneet tapahtumat | ||
|---|---|---|
| 2025 Q2-osavuosiraportti | 26.8. | |
| 2025 Q1-osavuosiraportti | 21.5. | |
| 2024 Yhtiökokous | 22.4. | |
| 2024 Q4-osavuosiraportti | 25.3. | |
| 2024 Q3-osavuosiraportti | 26.11.2024 |
Datan lähde: Millistream, Quartr
Asiakkaat katsoivat myös
Shareville
Liity keskusteluun SharevillessäShareville on aktiivisten yksityissijoittajien yhteisö, jossa voit seurata muiden asiakkaiden kaupankäyntiä ja omistuksia.
Kirjaudu
- ·2 päivää sittenThe🫡🇵🇱 first three 15 MW turbines, consisting of nacelles produced at Vestas’ factory in Poland, have been installed in the offshore wind farm Baltic Power. This achievement marks a crucial moment for the development of local content in the emerging Polish offshore wind industry. A total of 76 turbines will be installed in Polish waters in the Baltic Sea, and several of the nacelles come from the factory in West Pomerania. The V236-15.0 type nacelles are produced at Vestas’ newly opened facility in Poland, which belongs to the Danish-based world leader in wind power. In this factory, the first of its kind in Poland, Vestas has over 600 employees. Baltic Power is the first commercial customer and the first offshore wind project to install nacelles from this factory. Inside this structure, which in size resembles a three-story building, important equipment is installed that converts wind energy into electricity. The elements of the outer nacelle consist of the hub (to which the blades are attached) as well as lighting and cooling systems. In addition to the locally produced nacelles, the project will install components from Vestas’ nacelle factory in Lindo, Denmark. The installation of the wind turbines started in July 2025. The campaign is led by an o-class jack-up vessel supplied by Cadeler and supported by several CTV and SOV vessels.
- ·2 päivää sittenSmall investors are apparently throwing in the towel before the quarterly report while the big players have really bought up. Who is most likely to be right?😉·2 t sittenWill hold mine for many years, even though I am just a small piece in the game.
- ·12.11.Looks like a nice turnover with a good rise today 🤩 Could it be a crazy rally next week until the Q-report?·12.11.It will probably take time.. The stock has taken a beating lately.. Strong rise before report, can lead to a fall at the report, as the cat is out of the bag. The price has now been almost down to levels from when one was in Covid times, and they have grown since then. The fear among many is probably that it costs money, and one is afraid of cancellations, and that one is left with boats without a contract. I cannot see anything else, and this is probably due to Trump, as it becomes a form of approval for environmental considerations to be at the back of the queue. Offshore wind costs a lot, but I don't think one can avoid it. Technology tends to develop with investment, so one can hope that someone is willing to invest, so that costs can be reduced.
Yllä olevat kommentit ovat peräisin Nordnetin sosiaalisen verkoston Sharevillen käyttäjiltä, eikä niitä ole muokattu eikä Nordnet ole tarkastanut niitä etukäteen. Ne eivät tarkoita, että Nordnet tarjoaisi sijoitusneuvoja tai sijoitussuosituksia. Nordnet ei ota vastuuta kommenteista.
Uutiset ja analyysit
Tämän sivun uutiset ja/tai sijoitussuositukset tai otteet niistä sekä niihin liittyvät linkit ovat mainitun tahon tuottamia ja toimittamia. Nordnet ei ole osallistunut materiaalin laatimiseen, eikä ole tarkistanut sen sisältöä tai tehnyt sisältöön muutoksia. Lue lisää sijoitussuosituksista.
Q2-osavuosiraportti
83 päivää sitten‧53 min
Uutiset ja analyysit
Tämän sivun uutiset ja/tai sijoitussuositukset tai otteet niistä sekä niihin liittyvät linkit ovat mainitun tahon tuottamia ja toimittamia. Nordnet ei ole osallistunut materiaalin laatimiseen, eikä ole tarkistanut sen sisältöä tai tehnyt sisältöön muutoksia. Lue lisää sijoitussuosituksista.
Shareville
Liity keskusteluun SharevillessäShareville on aktiivisten yksityissijoittajien yhteisö, jossa voit seurata muiden asiakkaiden kaupankäyntiä ja omistuksia.
Kirjaudu
- ·2 päivää sittenThe🫡🇵🇱 first three 15 MW turbines, consisting of nacelles produced at Vestas’ factory in Poland, have been installed in the offshore wind farm Baltic Power. This achievement marks a crucial moment for the development of local content in the emerging Polish offshore wind industry. A total of 76 turbines will be installed in Polish waters in the Baltic Sea, and several of the nacelles come from the factory in West Pomerania. The V236-15.0 type nacelles are produced at Vestas’ newly opened facility in Poland, which belongs to the Danish-based world leader in wind power. In this factory, the first of its kind in Poland, Vestas has over 600 employees. Baltic Power is the first commercial customer and the first offshore wind project to install nacelles from this factory. Inside this structure, which in size resembles a three-story building, important equipment is installed that converts wind energy into electricity. The elements of the outer nacelle consist of the hub (to which the blades are attached) as well as lighting and cooling systems. In addition to the locally produced nacelles, the project will install components from Vestas’ nacelle factory in Lindo, Denmark. The installation of the wind turbines started in July 2025. The campaign is led by an o-class jack-up vessel supplied by Cadeler and supported by several CTV and SOV vessels.
- ·2 päivää sittenSmall investors are apparently throwing in the towel before the quarterly report while the big players have really bought up. Who is most likely to be right?😉·2 t sittenWill hold mine for many years, even though I am just a small piece in the game.
- ·12.11.Looks like a nice turnover with a good rise today 🤩 Could it be a crazy rally next week until the Q-report?·12.11.It will probably take time.. The stock has taken a beating lately.. Strong rise before report, can lead to a fall at the report, as the cat is out of the bag. The price has now been almost down to levels from when one was in Covid times, and they have grown since then. The fear among many is probably that it costs money, and one is afraid of cancellations, and that one is left with boats without a contract. I cannot see anything else, and this is probably due to Trump, as it becomes a form of approval for environmental considerations to be at the back of the queue. Offshore wind costs a lot, but I don't think one can avoid it. Technology tends to develop with investment, so one can hope that someone is willing to invest, so that costs can be reduced.
Yllä olevat kommentit ovat peräisin Nordnetin sosiaalisen verkoston Sharevillen käyttäjiltä, eikä niitä ole muokattu eikä Nordnet ole tarkastanut niitä etukäteen. Ne eivät tarkoita, että Nordnet tarjoaisi sijoitusneuvoja tai sijoitussuosituksia. Nordnet ei ota vastuuta kommenteista.
Tarjoustasot
Oslo Børs
Määrä
Osto
3 767
Myynti
Määrä
9 260
Viimeisimmät kaupat
| Aika | Hinta | Määrä | Ostaja | Myyjä |
|---|---|---|---|---|
| - | - | - | - |
Ylin
-VWAP
Alin
-Vaihto ()
VWAP
Ylin
-Alin
-Vaihto ()
Välittäjätilasto
Dataa ei löytynyt
Asiakkaat katsoivat myös
Yhtiötapahtumat
| Seuraava tapahtuma | |
|---|---|
| 2025 Q3-osavuosiraportti | 20.11. 3 päivää |
| Menneet tapahtumat | ||
|---|---|---|
| 2025 Q2-osavuosiraportti | 26.8. | |
| 2025 Q1-osavuosiraportti | 21.5. | |
| 2024 Yhtiökokous | 22.4. | |
| 2024 Q4-osavuosiraportti | 25.3. | |
| 2024 Q3-osavuosiraportti | 26.11.2024 |
Datan lähde: Millistream, Quartr
Q2-osavuosiraportti
83 päivää sitten‧53 min
Uutiset ja analyysit
Tämän sivun uutiset ja/tai sijoitussuositukset tai otteet niistä sekä niihin liittyvät linkit ovat mainitun tahon tuottamia ja toimittamia. Nordnet ei ole osallistunut materiaalin laatimiseen, eikä ole tarkistanut sen sisältöä tai tehnyt sisältöön muutoksia. Lue lisää sijoitussuosituksista.
Yhtiötapahtumat
| Seuraava tapahtuma | |
|---|---|
| 2025 Q3-osavuosiraportti | 20.11. 3 päivää |
| Menneet tapahtumat | ||
|---|---|---|
| 2025 Q2-osavuosiraportti | 26.8. | |
| 2025 Q1-osavuosiraportti | 21.5. | |
| 2024 Yhtiökokous | 22.4. | |
| 2024 Q4-osavuosiraportti | 25.3. | |
| 2024 Q3-osavuosiraportti | 26.11.2024 |
Datan lähde: Millistream, Quartr
Shareville
Liity keskusteluun SharevillessäShareville on aktiivisten yksityissijoittajien yhteisö, jossa voit seurata muiden asiakkaiden kaupankäyntiä ja omistuksia.
Kirjaudu
- ·2 päivää sittenThe🫡🇵🇱 first three 15 MW turbines, consisting of nacelles produced at Vestas’ factory in Poland, have been installed in the offshore wind farm Baltic Power. This achievement marks a crucial moment for the development of local content in the emerging Polish offshore wind industry. A total of 76 turbines will be installed in Polish waters in the Baltic Sea, and several of the nacelles come from the factory in West Pomerania. The V236-15.0 type nacelles are produced at Vestas’ newly opened facility in Poland, which belongs to the Danish-based world leader in wind power. In this factory, the first of its kind in Poland, Vestas has over 600 employees. Baltic Power is the first commercial customer and the first offshore wind project to install nacelles from this factory. Inside this structure, which in size resembles a three-story building, important equipment is installed that converts wind energy into electricity. The elements of the outer nacelle consist of the hub (to which the blades are attached) as well as lighting and cooling systems. In addition to the locally produced nacelles, the project will install components from Vestas’ nacelle factory in Lindo, Denmark. The installation of the wind turbines started in July 2025. The campaign is led by an o-class jack-up vessel supplied by Cadeler and supported by several CTV and SOV vessels.
- ·2 päivää sittenSmall investors are apparently throwing in the towel before the quarterly report while the big players have really bought up. Who is most likely to be right?😉·2 t sittenWill hold mine for many years, even though I am just a small piece in the game.
- ·12.11.Looks like a nice turnover with a good rise today 🤩 Could it be a crazy rally next week until the Q-report?·12.11.It will probably take time.. The stock has taken a beating lately.. Strong rise before report, can lead to a fall at the report, as the cat is out of the bag. The price has now been almost down to levels from when one was in Covid times, and they have grown since then. The fear among many is probably that it costs money, and one is afraid of cancellations, and that one is left with boats without a contract. I cannot see anything else, and this is probably due to Trump, as it becomes a form of approval for environmental considerations to be at the back of the queue. Offshore wind costs a lot, but I don't think one can avoid it. Technology tends to develop with investment, so one can hope that someone is willing to invest, so that costs can be reduced.
Yllä olevat kommentit ovat peräisin Nordnetin sosiaalisen verkoston Sharevillen käyttäjiltä, eikä niitä ole muokattu eikä Nordnet ole tarkastanut niitä etukäteen. Ne eivät tarkoita, että Nordnet tarjoaisi sijoitusneuvoja tai sijoitussuosituksia. Nordnet ei ota vastuuta kommenteista.
Tarjoustasot
Oslo Børs
Määrä
Osto
3 767
Myynti
Määrä
9 260
Viimeisimmät kaupat
| Aika | Hinta | Määrä | Ostaja | Myyjä |
|---|---|---|---|---|
| - | - | - | - |
Ylin
-VWAP
Alin
-Vaihto ()
VWAP
Ylin
-Alin
-Vaihto ()
Välittäjätilasto
Dataa ei löytynyt






